(343) 961-1313 Request a Quote
Bathroom Renovations in Arnprior

Bathroom Renovations

Bathroom renovations in Arnprior and across the Ottawa Valley, from powder rooms to full ensuites. Proper waterproofing under every tile, and fixtures that sit straight and stay that way.

Double vanity with round backlit mirrors in a renovated Arnprior bathroom
Licensed & Insured
Locally Owned & Operated
442 Jobs Completed Since 2021
Response Time Within 24 Hours
Bathroom Renovations in the Ottawa Valley

Waterproofing Comes First

A successful bathroom renovation begins beneath the finished surfaces. The condition of the subfloor, plumbing, ventilation and wet-area assemblies all influence how the room performs over time. We assess these elements alongside your layout and material preferences.

Our bathroom work includes full remodels, tub-to-shower conversions, vanity replacements and updated tile and fixtures. We help you compare options for storage, ease of cleaning and comfortable access while considering the dimensions and construction of your home.

Your written quote defines the proposed work and selected finishes, with any allowances or exclusions identified before construction begins.

How It Works

Steps in a Bathroom Renovation

  1. 01

    Site visit and quote

    We review the room, take measurements and discuss the changes you want to make. Existing plumbing locations, floor conditions and ventilation help establish the practical requirements of the renovation.

  2. 02

    Selections

    The vanity, shower or tub, fixtures, tile and other finishes are coordinated with the proposed layout. Product availability and installation requirements are considered when developing the schedule.

  3. 03

    Demo, plumbing and waterproofing

    Demolition exposes the areas included in the renovation. Required repairs, framing and service changes are completed, followed by preparation of the shower or tub assembly and appropriate waterproofing for the selected system.

  4. 04

    Tile, fixtures and glass

    Tile, flooring, cabinetry and fixtures are installed in sequence. Glass enclosures are measured at the appropriate stage, and the remaining finishes and adjustments are completed before the walkthrough.

Materials & Options

Showers, Tubs and Finishes

Tile shower or acrylic surround

A tiled shower offers flexibility in size, layout and finish details. Prefabricated bases and wall systems provide an alternative with defined dimensions and fewer grout joints. Both require compatible components and installation suited to the chosen system. We compare the options in relation to your space, maintenance preferences and budget.

Keep the tub or convert to a walk-in

The right arrangement depends on how your household uses the bathroom. A tub-to-shower conversion may improve access and free up usable space, while retaining a bathtub may better suit family needs. Low-threshold or curbless designs require early consideration of the floor structure, drainage and waterproofing.

Porcelain, ceramic or large format

Tile size, surface texture and layout affect both appearance and maintenance. Vanity dimensions influence storage and circulation, while lighting and mirror placement shape how the space functions. We coordinate these elements so the finished room feels considered rather than assembled from unrelated selections.

Cost Guide

Bathroom Renovation Prices

The scope of preparation and installation matters as much as the size of the room. Relocating fixtures, constructing a custom shower or repairing concealed water damage can substantially change the work required.

ProjectSizeTypical range
Powder roomToilet and sink$8,000 to $14,000
Main bathroomTub or shower$18,000 to $32,000
Large ensuiteShower, tub, double vanity$30,000 to $50,000

What Moves the Price

  • Shower system, tile coverage and installation detail
  • Plumbing relocations and ventilation improvements
  • Vanity, countertop and fixture selections
  • Glass enclosures, heated flooring and lighting
  • Wall, floor and structural repairs uncovered during demolition

Scheduling and Bathroom Access

We discuss the expected construction sequence and periods when the room will be unavailable. Curing requirements, trade visits and custom glass can affect the schedule. If this is your only bathroom, suitable temporary arrangements need to be established before work begins.

TimelineA powder room takes 1 to 2 weeks. A main bathroom takes 2 to 4 weeks. A large ensuite with a tiled shower and freestanding tub takes 3 to 6 weeks, most of it waiting on tile, membrane cure and glass.

Estimate My Budget

Why AHS

Details You See Every Day

We approach the bathroom as a complete construction project, with attention to preparation as well as appearance. Careful tile planning, coordinated fixtures and well-fitted finishes are supported by the work beneath them. Our team coordinates the agreed scope with the trades involved and keeps you informed as the room progresses.

Recent Work

Bathrooms We Have Rebuilt

Service Areas

Where We Build Bathrooms

Bathroom Renovations in Arnprior

Bathroom work in Arnprior ranges from 1970s bungalows on the north side to century homes downtown, where cast iron drains and plaster walls are part of the job.

Bathroom Renovations in Renfrew County

Across Renfrew County we build bathrooms in farmhouses, cottages and town homes alike. Septic and well systems do not change the finish, but they do shape the plumbing plan.

Bathroom Renovations in the Ottawa Valley

Our Ottawa Valley bathroom clients run from Carp and Kanata out to Pembroke. Ensuite additions in newer builds are a growing share of that work.

We also rebuild bathrooms for homes in Braeside, winterized cottages in Calabogie, older houses in Horton, village homes in Pakenham, rural homes near Carp, cottages on White Lake and century houses in Burnstown.

Questions

Bathroom Renovations FAQ

Can you replace a bathtub with a shower?

Yes, subject to the room’s dimensions and plumbing arrangement. We review the available space, drainage, access and finish options before recommending a layout.

Can you add a bathroom or ensuite?

A proposed bathroom needs to be assessed for usable space, drainage, ventilation and applicable approvals. We review the construction requirements before confirming feasibility and scope.

Can heated flooring be included?

Heated flooring can be considered during planning. Compatibility with the floor assembly, selected covering and electrical system needs to be established before installation.

Does every bathroom need to be stripped to the studs?

No. The extent of demolition depends on the existing condition and the proposed work. A full remodel may require extensive removal, while a focused upgrade may retain suitable surfaces and services.

How do you address water damage?

If damage is found, the source and extent need to be assessed before covering the affected area. We explain the repair requirements and any changes to the agreed scope.

Can a small bathroom include both a tub and a shower?

Possibly, but it depends on the actual dimensions, door openings, fixture clearances and plumbing arrangement. A measured layout helps establish whether separate fixtures are practical or a combined arrangement is more suitable.

Free, No-Obligation Quote

Start Your Bathroom Renovation

Book a free site visit. We measure, check the plumbing and give you a written price with your fixture choices built in.

CallFree Quote